
Cartridge Seals
Built for Pump OEMs.
From prototype validation to serial production, FBU supplies
complete factory-built cartridge seals configured around your
pump. Approved drawings, OEM part numbers, private-label
programs, and a controlled aftermarket route—without competing
for your customer relationship.
01
Adapt a Proven Seal Core
FBU begins with a mature seal-core architecture instead of unnecessarily redesigning the complete seal for every project. This creates a repeatable engineering and manufacturing foundation.
02
Configure for Your Equipment
The sleeve, gland, equipment interface, materials, and applicable supporting features are configured around your pump, operating requirements, and validation standards.
03
Reduce Repeated Development
Leverage the same proven internal architecture across similar pump platforms, reducing development risk and speeding up new equipment introduction.
04
Approved Drawings & BOMs
Establish approved drawings, bills of materials, and OEM part numbers with clear revision and configuration control through FBU’s PLM system.
05
Move from Prototype to Serial
Validate the prototype, freeze the configuration, then move to repeat production with predictable lead times and traceability.
06
Controlled Aftermarket Program
Build a controlled replacement and repair-kit program tied to your OEM part numbers, protecting your installed-base aftermarket revenue.
Confirm Interfaces
Shaft, sleeve, seal-chamber, gland, and installation interfaces are verified against the pump drawing before the seal is finalized.
Coordinate Installation & Testing
FBU supports cartridge seal installation and participates in pump-performance testing at the nominated factory.
Supply Test & Backup Seals
Reusable dedicated test seals, repair kits, and backup seals are prepared to keep pump commissioning on schedule.
Freeze Configuration
Approved configuration, customer part numbers, BOMs, and replacement information are recorded for repeat supply.
Identification
Clear product identification and a unique serial number for traceability.
Drawings
Outline and installation drawing, plus applicable installation information.
Certificates
Certificate of Conformity and an air-leak test report for every applicable complete cartridge seal.
Documentation
Packing documentation; inspection records are retained for traceability.
01
Send What You Have
Start with a pump model,existing seal information,drawing,dimensions, photos,or a failed seal sample.
02
Define What Is
Missing
FBU identifies available information and lists the additional data required for proper seal selection.
03
Review the
Application
Review equipment interfaces, operating conditions, materials,standards, documentation, and testing requirements.
04
Propose the
Configuration
Receive the recommended configuration, materials, technical boundaries, quotation, lead time, and required confirmations.
05
Approve the Drawing
Confirm outline, installation dimensions, interfaces, materials, and applicable project requirements.
06
Manufacture & Test
FBU manufactures critical components, completes inspection, assembles the cartridge, and performs air-leak testing.
07
Deliver the Prototype
Receive product identification, drawings, installation information, Certificate of Conformity,and test report.
08
Validate the
Application
Complete installation, pump testing, or field validation with remote or China-based coordination.
09
Freeze the
Configuration
Freeze drawing, materials,BOM, customer part number, internal part number, and revision status.
10
Repeat Production
Move to serial supply, repair kits, replacement seals, configuration control, and change notification.
HAAS Machining
Sleeves, glands, seal ring holders and other critical metal parts machined in-house.
Precision Inspection
Dimensional inspection applied to critical dimensions according to the inspection plan.
ZEISS Inspection
Applied to selected critical dimensions and components per the inspection plan.
Controlled Assembly
Factory cartridge assembly under controlled procedures and environments.
Static Air-Leak Testing
Every applicable complete cartridge is air-leak tested before shipment.
SAP + PLM Control
Order, drawing, BOM and product-data management connected through SAP and PLM.